To coordinate and monitor the progress of works, in order to met the deadlines.
Civil, Industrial and Agricultural Construction Engineer
Category EXECUTION

The cyclist path along the Cibin river is realized on a route consisting of six distinct segments, totaling a length of 3,674 meters.
The rehabilitated road establishes a connection between County Road 106A and the chairlift area at the base of the Oncești slope.
The bridge spans 70.2 m and consists of 3 openings.