Coordination of assembly activities for prefabricated concrete elements on construction sites.
Construction Engineer – Assembly of Prefabricated Elements
Category CON-A PRODUCTIONS

The cyclist path along the Cibin river is realized on a route consisting of six distinct segments, totaling a length of 3,674 meters.
The rehabilitated road establishes a connection between County Road 106A and the chairlift area at the base of the Oncești slope.
The bridge spans 70.2 m and consists of 3 openings.