To coordinate the execution activities of installation works on the construction site.
Installation Engineer – Execution
Category CON-A MEP

The cyclist path along the Cibin river is realized on a route consisting of six distinct segments, totaling a length of 3,674 meters.
The rehabilitated road establishes a connection between County Road 106A and the chairlift area at the base of the Oncești slope.
The bridge spans 70.2 m and consists of 3 openings.