To achieve coordination between specialties (HVAC, fire extinguishing systems, smoke extraction, etc.), and to create and follow up on the installation work schedule.
Mechanical Installations Engineer
Category EXECUTION

The cyclist path along the Cibin river is realized on a route consisting of six distinct segments, totaling a length of 3,674 meters.
The rehabilitated road establishes a connection between County Road 106A and the chairlift area at the base of the Oncești slope.
The bridge spans 70.2 m and consists of 3 openings.