Specific activities of Health and Safety (H&S) and Fire Safety (FS) within the Oradea construction site.
SSM Site Manager – ORADEA
Category EXECUTION

The cyclist path along the Cibin river is realized on a route consisting of six distinct segments, totaling a length of 3,674 meters.
The rehabilitated road establishes a connection between County Road 106A and the chairlift area at the base of the Oncești slope.
The bridge spans 70.2 m and consists of 3 openings.