To coordinate and monitor the progress of works, in order to met the deadlines.
Road and Bridge Construction Engineer
Category EXECUTION

The cyclist path along the Cibin river is realized on a route consisting of six distinct segments, totaling a length of 3,674 meters.
The rehabilitated road establishes a connection between County Road 106A and the chairlift area at the base of the Oncești slope.
The bridge spans 70.2 m and consists of 3 openings.