Full speed ahead: Constructing the new Turda – Tureni Expressway

We are very pleased to announce that we will be part of the consortium that will execute the expressway to create the connection between the A3 Highway (Turda area) and DN1 (Tureni area). The expressway, approximately 5 km long, will feature 3.5 meters lane, a shoulder width of 2.25 meters and a median area equipped with direction separators.

The investment aims to create 9 structures (8 bridges and one viaduct), the most complex of which will be at kilometer 4+341 over the Valea Racilor, a viaduct with 6 spans and a total length of 258 meters, with a deck measuring 246 meters.

We are ready to start go full force ahead, alongside our partners in the consortium: DIMEX-2000 COMPANY (Leader), OBRAS PUBLICAS Y REGADIOS, OPR ASFALT, AUTOTEHNOROM.