Friday March 29 and Saturday March 30 we are waiting for you to meet us, we will be present at the CONA stand at the Career Fair (Transilvania Hall – Sibiu) with job offers specific to construction and more!
Test eeng
Category CON-A News

The cyclist path along the Cibin river is realized on a route consisting of six distinct segments, totaling a length of 3,674 meters.
The rehabilitated road establishes a connection between County Road 106A and the chairlift area at the base of the Oncești slope.
The bridge spans 70.2 m and consists of 3 openings.